Newark, New Jersey · Building since 2016 General contractor · Construction manager · Design-builder CareersNewsroomPrequalifyProject map
Projects · Buildings

Buildings that open on time.

Healthcare, education, civic, cultural, sports and commercial buildings delivered for owners who could not afford to miss a date.

Sector
Delivery
8 projects
2024Healthcare Pediatric Hospital TowerA nine-story children’s hospital tower with a pediatric ICU, family suites and a rooftop healing garden, built beside a hospital that never stopped admitting patients.U.S.312,000 SFCM at-risk2023Higher Education Health Sciences & Nursing BuildingSimulation hospital wards, anatomy labs and a four-story learning atrium, built so nursing students train in rooms that work like the real thing.U.S.148,000 SFDesign-build2022K–12 Education Regional STEM Magnet SchoolA magnet high school with fabrication labs, a planetarium classroom and a green roof that doubles as a science lab, built over one summer-to-summer cycle.U.S.176,000 SFCM at-risk2021Justice & Public Safety Fire Rescue Headquarters & Training TowerA fire headquarters with an eight-bay apparatus hall, an emergency command floor and a live-burn training tower for the whole region’s crews.U.S.96,000 SFDesign-build2025Cultural & Performing Arts Science Center & PlanetariumHands-on exhibit halls, a 300-seat dome theater and a glass-walled maker lab, built around a planetarium projection system installed to the millimeter.U.S.118,000 SFCM at-risk2022Sports & Entertainment Collegiate Aquatics CenterA 50-meter competition pool, a diving well and an 1,800-seat natatorium, with air and water systems tuned for championship meets.U.S.1,800 seatsDesign-build2020Federal Veterans Outpatient ClinicPrimary care, mental health, imaging and rehabilitation for veterans under one roof, built to federal security and medical standards on a fixed-price contract.U.S.142,000 SFDesign-build2023Commercial Life Sciences Lab & Office BuildingA speculative lab and office building with heavy floor loads, vibration-controlled bays and a shaft plan ready for any tenant’s research.U.S.265,000 SFGeneral contracting
Start a conversation

Your project could be next.

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.