Newark, New Jersey · Building since 2016 General contractor · Construction manager · Design-builder CareersNewsroomPrequalifyProject map
Our history · 2016 to today

Built one capability at a time.

Tum Harry did not start big. We incorporated in Newark, New Jersey in 2016 with a few builders and a promise to keep, then added crews, engineers and delivery models only when we could stand behind them.

Incorporated in Newark
2016
Today
2026
Capabilities today
14
The timeline

From first site to full-service builder.

Every era added something we used to buy from someone else. Each one made the next promise easier to keep.

2016
Founding

Incorporated in Newark, New Jersey

Tum Harry LLC was incorporated in Newark, New Jersey in 2016 by builders who knew technology, construction and infrastructure from the inside. They had watched too many projects finish the structure on time and then lose months to the networks, controls and security systems inside it. So they set one standard from day one: the building is not done until everything in it works.

  • General contracting
  • Technology systems
  • Newark, New Jersey
2018
Phase two

Bringing the work in-house

Waiting on other people’s crews cost our owners time. So we hired our own. Concrete came first, then steel erection and earthwork, along with the equipment to support them. That control showed on work like the Adaptive Reuse Loft Apartments in 2018 and the Supportive Housing & Health Clinic in 2019, where new systems had to fit inside old walls and occupied neighborhoods.

  • Self-performed concrete
  • Steel erection
  • Earthwork
  • CM at-risk
2020
Phase three

Planning before building

Owners wanted certainty earlier, so we moved our builders upstream. Preconstruction, estimating, scheduling and an in-house VDC team joined the company, and with them came design-build delivery. The Veterans Outpatient Clinic and the Graduate & Family Student Apartments in 2020, then the Fire Rescue Headquarters and the Cold Storage Distribution Center in 2021, were all delivered design-build.

  • Preconstruction
  • Project controls
  • VDC
  • Design-build
2022
Phase four

From buildings to infrastructure

The same crews that poured foundations could build utilities, water work and civil structures. We took on energy work through EPC delivery with the Utility Operations Center & Microgrid in 2022, then grew a civil and infrastructure practice with the Flood Resilience Pump Station in 2023 and the Highway Tunnel Rehabilitation in 2024. Four sectors, one way of working.

  • Civil & infrastructure
  • Energy
  • EPC
  • Water & flood resilience
2026
Today

Today

Tum Harry now delivers fourteen capabilities across four sectors and twenty-two markets, from a pediatric hospital tower and a green hydrogen plant to an offshore wind port terminal and a new urban innovation district. The company is larger. The rule from the first sites still runs every job.

  • 14 capabilities
  • 4 sectors
  • 22 markets
The thread through every era

Same rule. Bigger jobs.

A superintendent from our first sites would recognize how we run a job today. The morning huddle, the three-week lookahead, the walk with the owner before every pour. The tools changed. The habits did not.

2016
Where it started
4
Sectors today
22
Markets today
Why we grew

How the capabilities came together.

Each addition answered a problem owners kept bringing us.

Self-performed crewsSchedule control

Subcontractor availability kept setting our critical path. Owning the concrete, steel and earthwork put the schedule back in our hands.

Preconstruction & estimatingCost certainty

Owners needed real numbers before design was finished. Builders at the design table turned budgets into GMPs they could plan around.

Virtual design & constructionFewer surprises

MEP conflicts found in the field cost weeks. Coordinating in the model moved those fixes to the office, where they cost hours.

Technology systemsDay-one ready

Owners kept inheriting buildings whose networks, AV and racks were still being finished after move-in. We brought structured cabling, AV, controls and security systems under the same contract, so the systems are tested before the keys change hands.

Design-build & EPCSingle source

Some owners wanted one contract for design and construction. We built teams that could carry that risk and answer for it.

Civil & energy workWider reach

Communities need roads, water and power as much as buildings. Our crews already had the skills, so we built the practices around them.

Facilities & disaster responseAfter handover

Owners asked us to stay. Transition support and rapid response keep us accountable long after the ribbon is cut.

What has not changed
Do what you said.

A date in the schedule is a promise to an owner, a trade partner and a crew. We treat it that way.

Own the outcome.

When something goes wrong on site, we fix it first and sort out the paperwork second.

Grow carefully.

We add a capability when we can staff it with people we trust, not when a brochure needs it.

Start a conversation

Write the next chapter with us.

Bring us your next project. You will get the same builders who grew this company, and the same rule they started with.